Cable route construction
We ensure that all cables are laid professionally so that the electricity can be discharged from the solar park. We often cover distances of 20 to 30 kilometers and more.
Our services in detail:
Route planning:
- Development of an efficient cable route, taking into account the existing local conditions and obstacles (railroad lines, roads and bodies of water)
Securing the route:
- Legal safeguarding of the planned route with the landowners
- Obtaining the necessary approvals, including nature conservation requirements
Route coordination:
- Coordination of all trades involved in the construction of the complete route from the solar park to the grid connection point
- Coordination of construction measures with municipalities, landowners and other interest groups
Route construction:
- Laying of medium-voltage cables using open trench construction and modern drilling methods
- Implementation of all measures to protect the environment and existing infrastructure, taking into account the interests of local residents
- Drilling/flush drilling: use of innovative horizontal drilling technology for laying cables or pipes underground, deliberately reducing the impact on the existing infrastructure